• User Info
  • Name:
    waheed 
  • Submitted By:
     
  • Email:
  • District:
     
  • Town:
     
  • Report Info
  • Report Status:
    Closed 
  • Service:
     
  • System Date:
    22 Sep, 2016 09:45:09 pm 
  • Submitted Date:
    22 Sep, 2016 09:36:17 pm 
  • Observation:
    done with ayubia water supply survey. i have completed the whole survey along with tax collector nasir faraz,naveed valveman of ayubia,aftab pipe fiter and abdullah water supply staff supervisor. but in this whole survey sub engineer was absent. i ask several times but he reported always that he has very important works at abbotabad office. 
  • Priority:
    High 
  • Image:

Report Observation(1)

20 October 2016

Submitted Date System Date Observation Submitted By Image Action
20 Oct 2016 10:32:14 am 20 Oct 2016 10:35:55 am the first day was just a preliminary survey in which he was present and i only checked 5 connections. the detail survey was started the next day and from that day onwards he was never present.

Assigned Reports

Assigned Date Due Date Report No. Assigned To Assigned By Internal Note Action

Report Actions

Closing Remarks:

1