  • Report Status:
    Closed 
  • Service:
     
  • System Date:
    21 Feb, 2017 12:27:23 pm 
  • Submitted Date:
    21 Feb, 2017 12:17:03 pm 
  • Observation:
    developmental projects. 1.most of the tiles are damaged and removed from floor at ayubia chairlift station. 2. all the lights are damaged which were installed(beautification project) 3. no tiles are placed or installed at ayubia top chairlift station which were included in beautification project. 4. low quality paint was done which is now damaged at several points. 5. walking track is not completed at ayubia hill top which was also included to repair all walking tracks at top. overal material used is of low quality 
  • Priority:
    High 
  • Image:

Report Observation(0)

Assigned Reports

Assigned Date Due Date Report No. Assigned To Assigned By Internal Note Action

Report Actions

Closing Remarks: