• User Info
  • Name:
    waheed 
  • Submitted By:
     
  • Email:
  • District:
     
  • Town:
     
  • Report Info
  • Report Status:
    Closed 
  • Service:
     
  • System Date:
    10 Jul, 2017 11:00:03 am 
  • Submitted Date:
    10 Jul, 2017 10:46:11 am 
  • Observation:
    it is to report that khanaspur town is having 2 sources of water. 1. we are getting water from dongagali line(muree water board) which pass through ayubia to murree. there are 3 water lines passes through ayubia to muree of muree water board. 8 inch, 9 inch and 6 inch. we have a connection there from 9 inch line only but the alarming thing is that in seasons murree water board cut off the water supply from their 9 inch line. we must have to take a second connection from their 8 inch line which is always full of water following to muree. 2. we have another source of water to khanaspur which is khachar gali source and that source water pump is always short of voltage. for that reason GDA is installing 100 KW stablizer to 85 HP water pump in khanaspur khachar gali. this may resolve the water issue to some extent but khanaspur town is a big town and the required water for all town is above 80000 gallons and in source we have only 15 to 20000 gallons. 3. the required water for town is 80000 gallons and according to both sources dongagali line and khachargali line we have 25000 to 28000 gallons which is still insufficient 
  • Priority:
    High 
  • Image:

Report Observation(0)

Assigned Reports

Assigned Date Due Date Report No. Assigned To Assigned By Internal Note Action
10 Jul, 2017
15 Jul, 2017 3509 1

Report Actions

Closing Remarks:

1